Springdale Cemetery

Springdale Cemetery

Cemetery Roads Update


2023 Update: The back old dirt maintenance road in the North/West portion of the Cemetery was raised, graveled and graded (picture attached).

Also, more gravel and grading took place is the far north road closest to Block 104.

Total price for this work was $5813.

(No donations were used for this work)

 

A big thanks goes out to BWC Excavation for doing this for us and far exceeding our expectations!!


Thank you BWC!!!

 

2022 Update: The north/south road in the back far west section was repaired.

Over the years the three thirty foot concrete slabs became very uneven producing great height difference between the slabs, very noticeable when driving over them.

We utilized Concrete PolyFix Company to level these slabs and also grind transitional points. Height differences were removed producing a smooth drive.

The total price for this project was $7736.10

(No donation were used for this work)


Thank You Concrete PolyFix!!!